Overhead Equipments |
|
|
|
Booster Stations |
|
|
|
Switching Stations |
|
|
|
Transition Sub Stations |
|
|
|
Operation &
Maintenance of
Overhead Equipment |
|
|
|
Operation & Maintenance
of Power Supply
Installations |
|
|
|
|
Projects |
|
|
Projects completed in the last three years
Details of some of the Major Works completed during last Three Years
1 |
Electrification of Railway sidings at Ramagundam |
36 Kms |
SC Railway |
2 |
Electrification of Doubled track between Kakinada and Samalakota |
18 Kms |
SC Railway |
3 |
Electrification of doubled track between Kakinada Town and Port Stations including Provision of New SSP |
13 and 1 No of SSP |
SC Railway |
4 |
Modifications to OHE in Secunderabad Division |
Modification |
SC Railway |
5 |
Replacement of 6X6 BFB Mast with B-150 Mast in Vijayawada Division |
833 Nos |
SC Railway |
6 |
Conversion of 1500 Volts DC system to 25 kV AC system at Belapur and Panvel |
Modification work |
Central Railway |
7 |
Electrification and modification to OHE between Diwa – Kurla of Mumbai Division |
16 Kms |
Central Railway |
8 |
Electrification of My Home Industries Cement Plant Siding, Regupalem in Vijayawada Division |
8.5 Kms |
My Home Industries |
9 |
Electrification of new loop lines between Naupada and Lakkavarapukota of VSKP division |
6.0 Kms |
Eco Railways |
10 |
Electrification of Cement Plant Siding, Raghavapuram |
1.00 Kms |
Kesoram Cements |
11 |
Electrification of Cement siding, Upparvahi |
1.5 Kms |
Ambuja Cements |
12 |
Replacement of anticreep wire of Mumbai Division. |
Modification work |
Central Railway |
13 |
Replacement of Cantilever Assemblies over Secunderabad Division. |
300 Nos |
SC Railway |
14 |
Modification to OHE at MLY-PPZ, CHZ of Secunderabad Division. |
Modification |
SC Railway |
15 |
Replacement of MOCBs with Vacuum Interrupters in Secunderabad Division |
12 Nos |
SC Railway |
16 |
Electrification of Railway Sidings at Mandamarri |
2.0 kms |
SC Railway |
17 |
Electrification of chord line between Moula Ali and Malkajgiri of S C Division |
15 Tkm |
SC Railway |
18 |
Replacement of MOCBs and 25 KV Feeder provision between Manigarh and Pandarpauni |
16 Tkm |
SC Railway |
19 |
Electrification of Railway siding at yerraguntla in Guntakal Division |
18 Tkm |
Bharathi Cements |
20 |
Electrification of Railway Siding at Mellacheruvu |
10 Tkm |
My Home Industries |
21 |
Modifications to OHE in Secunderabad Division |
Modification |
SC Railway |
22 |
Electrification of Railway lines between Thane-Kurla and Thane Yard of Mumbai Division |
Modification |
Central Railway |
23 |
Electrification of track between Dornakal Jn and Karepalli and provision of 25 KV feeder wire in Secunderabad division |
22Tkm (OHE) 28Km (Feeder) |
SC Railway |
24 |
"Traxun Towers" received a prestigious contract from ADANI PETRONET(DAHEJ) Port limited for Electrification of Railway Siding at DAHEJ, Gujarat. |
12kms |
ADANI |
25 |
Electrifiation of Railway Siding at Tandur, SC Railway. |
6.5 |
CCI |
26 |
Construction of Tramway type OHE at Orient Cement, Devapur. |
18,10,249 |
Private Siding |
27 |
Extension & commissioning of OHE on Spur -3 & 4 at Kakinada Seaports Ltd, Kakinada of Bil Infra Tech Ltd. |
27,19,995 |
Private Siding |
28 |
Design,Supply, Erection,Testing & Commissioning of 25KV, AC,1-PH Power Supply at OHE Lab –M/S.Medha Servo Drives Pvt Ltd, Hyderabad |
87,80,148 |
Private Siding |
29 |
OHE Works for BV Railway Siding at Mellacheruvu cement unit , Kodad, Nalgonda Dist of M/S. My Home Industries Ltd. |
15,50,000 |
Private Siding |
30 |
Execution of Railway OHE Line No.10 modification at Awarpur Cement works , Tal.Korpana, Dist Chandrapur, Maharashtra M/s. UltraTech Cement Ltd. |
34,00,000 |
Private Siding |
31 |
Modification of OHE for proposed cross overs from Line no.1 to 2 and Line No. 4 to 3 in Manuguru SCC Limited, CSP Private Siding. |
32,24,749 |
South Central Railway |
32 |
Design, Supply, Erection, Testing & Commissioning of 25 KV AC 50Hz single phase Traction over head equipment including provision of 2nd transformer bat at Nidiguntapalem TSS, Signalling works and other associated works in connection with doubling of Railway track between Venkatachalam road Jn station and Krishnapatnam Railway station of Vijayawada division of South Central Railway |
17,75,38,521 |
South Central Railway |
|
Projects in Progress
Details of some of Major Works under Execution as on 13-1-2011
1 |
Design, Supply, Erection, Testing and Commissioning of 25 KV AC OHE works from CH: 1535.00 to 20436.200 for the proposed rail infra facilities to serve KSK MPCL siding at Akaltara, Chattisgarh state. |
15,19,99,293 |
Private Siding |
Work In Hand |
2 |
Electrification & OHE Modifications in Sanathnagar & Cheruvumadhavaram Railway Yards in SC Railway. |
Modification Works |
SC Railway |
Work in initial stage |
3 |
TRAXUN TOWERS received a contract for provision of 13kms of 25kv feeder wire and OHE modification works in secunderabad division of SC railways. |
13kms |
SC Railway |
Work in progress |
4 |
Design, Supply, Erection, Testing & Commissioning of 25KV Railway Electrification for Railway Siding of M/S.KSK Mahandi Power Company Ltd, Akaltara, Chattisgarh State. |
42 |
M/S.KSK Mahandi Power Company Ltd |
Work in Progress |
5 |
Proposed Rail infrastructural facilities for Krishnapatnam Port-Execution of OHE works for the KPCL siding and yards-Reg. |
9,07,25,505 (TKM -25.172) |
Private Siding |
|
6 |
Supply &Erection of 25KV, 50 Hz Conventional &Tramway Regulated type OHE for lead line and Inplant siding at Tandur for M/S.Penna Cements Ltd |
1,55,04,055 |
Private Siding |
|
7 |
Supply and erection of Circuit breaker and feeder arrangements to the lead line of Bharathi Cements & Zuari siding lines served by Yerraguntla station on Guntakal division. |
35,00,690 |
Private Siding |
|
8 |
Supply of OHE Electrical Items for 3rd Railway Line at Kakinada for M/S.Coramandel International Ltd. |
70,09,373 |
Private Siding |
|
9 |
Design Supply, Erection, Testing & Commissioning of 25 KV AC OHE (Tramway Type) works for Proposed FCI Siding at Nekkonda, Secunderabad Division. |
35,00,000 |
Private Siding |
|
10 |
OHE Works for Railway siding for Hindustan Petroleum Corporation Limited at Kadapa. |
1,92,83,850 |
Private Siding |
|
11 |
Design, Supply Erection, Testing and commissioning of 25 KV, 50 Hertz, Single phase, A.C.Traction Switchgear equipment at Proposed new sub –sectioning and Paralleling Post at Mandamari and Peddampet including modifications to the existing Switching Stations at Mancheriyal [SP], Ramagundam [TSS/FP] and Raghavapuram [SSP] due to Patch tripling between Mandamari & Raghavapuram on Kazipet- Balharshah section of S.C. Railway. |
3,54,99,297 |
South Central Railway |
|
12 |
Replacement of cross feeder, worn-out contact wire, structure bonds etc. and OHE modifications in SC Division. |
1,38,82,364 |
South Central Railway |
|
13 |
Modification of OHE in lieu of Proposed Road Over Bridges at Level Crossings in SC Division |
72,39,830 |
South Central Railway |
|
14 |
Provision of TSS Operator for Eleven Traction Sub-stations of Vijayawada Division. |
66,97,469 |
South Central Railway |
|
15 |
Replacement of existing Aluminium cross feeder with 150 sq.mm stranded copper wire in SC Division and modification of OHE at M/s. NTPC Ltd, Ramagundam. |
64,42,616 |
South Central Railway |
|
16 |
D, S, E, T, and Commissioning of 25 Kv, 50 Hz, a.c. single phase Traction Overhead Equipment on Budameru diversion channel Bridge No.773 between Kondapalli and Rayanapadu stations on Kazipet-Vijayawada section of South Central Railway. |
1,03,95,903 |
South Central Railway |
|
17 |
OHE modification work in connection with proposed construction of Foot Over brdges at Km 19/6-7 & Govandi East and between Km 19/9-10 at Govandi - Mankhurd section of Mumbai Division. |
34,48,933 |
Central Railway |
|
18 |
OHE modification work in connection with proposed construction of 12 mtrs wide FOB at middle of Thane station in Mumbai division. |
43,41,656 |
Central Railway |
|
19 |
OHE works in connection with (a) Bhivandi road - New loop line to deal full rake parcel (710 m) & (b) Repairs to ATD anchor mast to reduce the excessive stress at foundations in Jassai - Vassai section of Panvel district. |
91,41,167 |
Central Railway |
|
20 |
D,S,E,T, & C of 1500 V DC/25 KV AC OHE in connection with EMU Stabling Siding at Belapur, Panvel (including Panvel Yard), Khopoli & Karjat of Mumbai Division in C Rly. |
5,00,17,951 |
Central Railway |
|
|
|
|
|
|